Increasing aircraft carrier forward presence [electronic resource] : changing the length of the maintenance cycle / Roland J. Yardley ... [et al.].

Contributor(s): Material type: TextTextSeries: Rand Corporation monograph seriesPublication details: Santa Monica, CA : RAND Corp., 2008.Description: 1 online resource (xx, 70 p.) : col. illISBN:
  • 9780833045959 (electronic bk.)
  • 0833045954 (electronic bk.)
  • 9780833044075 (pbk. : alk. paper)
  • 0833044079 (pbk. : alk. paper)
Report number: MG-706-NAVYSubject(s): Genre/Form: Additional physical formats: Print version:: Increasing aircraft carrier forward presence.DDC classification:
  • 359.9/4835 22
LOC classification:
  • V874.3 .I53 2008eb
Online resources:
Contents:
Introduction -- Past, current, and potential carrier cycles -- The impact of different cycles on operational availability -- The impact of different cycles on the maintenance industrial base -- Findings and recommendations -- Appendix: Workload graphs for the Norfolk and Puget Sound Naval Shipyards.
Summary: The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs.
Tags from this library: No tags from this library for this title. Log in to add tags.
No physical items for this record

"Prepared for the United States Navy."

"MG-706-NAVY"--P. [4] of cover.

Research conducted within the Rand National Defense Research Institute.

Includes bibliographical references (p. 67-70).

Introduction -- Past, current, and potential carrier cycles -- The impact of different cycles on operational availability -- The impact of different cycles on the maintenance industrial base -- Findings and recommendations -- Appendix: Workload graphs for the Norfolk and Puget Sound Naval Shipyards.

The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs.

Description based on print version record.

There are no comments on this title.

to post a comment.
Library, Documentation and Information Science Division, Indian Statistical Institute, 203 B T Road, Kolkata 700108, INDIA
Phone no. 91-33-2575 2100, Fax no. 91-33-2578 1412, ksatpathy@isical.ac.in