Practical Production planning and control
Material type:
- 658 H615(5.2)
Item type | Current library | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|
Books | ISI Library, Kolkata | 658 H615(5.2) (Browse shelf(Opens below)) | Available | 31190 |
Total holds: 0
Browsing ISI Library, Kolkata shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
658 H615(4.3) Front line of management | 658 H615(4.4) How to organize and run apprentice systems | 658 H615(4.5) Suqervisory program for the office | 658 H615(5.2) Practical Production planning and control | 658 H615(5.3) Inventory control | 658 H615(5.5) Reducing costs through methods and time study | 658 H615(5.6) Plant engineering: Building design and basic lay-out |
Reading course in executive technique, ed. by Carl Heyel
There are no comments on this title.
Log in to your account to post a comment.